...
- Look for a free DUT resource (Jenkins Lock)
- Retrieve the automated build image
- Deploy the image on the DUT
- Verify the image has flashed successfully
- check version.txt
- key service and process checks e.g. wpeframework, rmfstreamer etc
- has IP
- Retrieve the DUT logs pre test
- includes a long set of commands CMF define
- retrieve the actual device logs (/opt/logs)
- Perform the video command line and UI testing
- Screenshots and other useful info is captured here
- Retrieve the DUT logs post test
- Prepare a test report (for contributions this is sent to Gerrit/Github and Verified/Platform-Verified status is set accordinly)
- Power down the device and free it for the next request
Some examples of the automated flows:
Gallery |
---|
exclude | at301 |
---|
title | Automated Flow Examples |
---|
|